Sceilg Mhichíl Works Report 2021
Posted on 23 août 2022
The Sceilg Mhichíl Works Report 2021 aims to outline the repair works completed on the UNESCO World Heritage Property of Sceilg Mhichíl in the season of 2021.
-
Download the Sceilg Mhichíl Works Report 2021 -
Download Appendix A - NIS Repair of Sea-wall along Old Lighthouse Road – Phase 4 -
Download Appendix B - NIS Construction of Public Toilets and Repair to Helicopter Pad, Repair to Pier Wall at Landing Pier and Repair of Gate Piers at Upper Lighthouse -
Download Appendix C - OPW COVID 19 Health and Safety Management Plan -
Download Appendix D - NIS Construction of 3 No. Permanent Crash Decks on Lighthouse Road -
Download Appendix E - Glenwood Specialist Report on Condition of Remaining Timbers of Lower Lighthouse -
Download Appendix F - Glenwood Timber Report Photos -
Download Appendix G - UCC Atlantic Puffin Tagging Report -
Download Appendix H - Archaeological Excavation of the Upper Lighthouse Station -
Download Appendix I - Discovery Programme Monitoring Survey Report -
Download Appendix J - Preliminary Visual Assessment of Building Stone at the Upper and Lower Lighthouses Skellig Michael