Sceilg Mhichíl World Heritage Property Management Plan 2020–30: Action Programme – Progress Tracker (March 2023)
Posted on 31 July 2023
This report, dated March 2023, tracks the progress of implementing the action programme of the Sceilg Mhichíl World Heritage Property Management Plan 2020–30.

Summary of the Attributes for Ireland’s two existing World Heritage Properties - ‘Brú na Bóinne’ and ‘Sceilg Mhichíl’
Posted on 28 July 2023
This report provides the methodology for the extraction and distillation of the attributes of the World Heritage Properties of Brú na Bóinne and Sceilg Mhichíl from their Statements of Outstanding Universal Value in the context of UNESCO’s Third Cycle Periodic Reporting for Europe and North America.

Sceilg Mhichíl Works Report 2022
Posted on 4 May 2023
The Sceilg Mhichíl Works Report 2022 aims to outline the repair works completed on the UNESCO World Heritage Property of Sceilg Mhichíl in the season of 2022.
-
Download the Sceilg Mhichíl Works Report 2022
-
Download Appendix A - Discovery Programme Monitoring Skellig Michael Survey Report
-
Download Appendix B - NIS Proposed Application for the construction of a composting toilet within the Lower Lighthouse Complex
-
Download Appendix C - Artificial Nest Sites as a tool to enhance breeding Seabird Monitoring on Skellig Michael
-
Download Appendix D - Sceilg Mhichíl Seabird Conservation Monitoring
-
Download Appendix E - Statement of Significance The Skellig Lighthouses
-
Download Appendix F - An Analysis of the Visitor Carrying Capacity of the Monastic Enclosure
-
Download Appendix G - Reconnaissance Report Geological Context of Rockfall Monday 13th June 2022 Lower Lighthouse Road
-
Download Appendix H - Sweep of Rockfall Area Report
-
Download Appendix I - NIS Proposed Installation of Approximately 100m Crash Deck at Cross Cove
-
Download Appendix J - Archaeological Impact Assessment of Proposed Canopy Installation, Lower Lighthouse Road
-
Download Appendix K - Environmental Incident Report
-
Download Appendix L - Archaeological Impact and Mitigation Strategy for the installation of Three Crash Decks, Lighthouse Roadway
-
Download Appendix M - NIS Proposed Application for the Installation of CCTV, Associated Electrical Equipment and Solar Panels on the Store Building Adjacent to the Landing Pier at Skellig Michael
-
Download Appendix N - Removal of a section of North gate of Lower Light Station
-
Download Appendix O - Excavations in the Upper Lighthouse Station
-
Download Appendix P - Archaeological Monitoring of Construction of 3 No. Crash Decks on the Lighthouse Roadway
-
Download Appendix Q - Archaeological Monitoring of Extension of Cross Cove Canopy on the Lower Lighthouse Roadway
-
Download Appendix R - Monitoring of miscellaneous minor works in the Lower Lighthouse and Monastery 2022
-
Download Appendix S - Geological Context of Rockfall Potential

World Heritage Tentative List Technical Evaluation
Posted on 25 November 2022
The World Heritage Tentative List Technical Evaluation sets out how each Tentative List application was evaluated and outlines the basis for inclusion in Ireland’s new (2022) World Heritage Tentative List.

Sceilg Mhichíl Seabird Conservation Monitoring 2021
Posted on 23 August 2022
The Sceilg Mhichíl Seabird Conservation Monitoring 2021 focuses on species such as Kittiwakes, some auks, Fulmar as well as the more dispersed large gulls.

Sceilg Mhichíl Works Report 2021
Posted on 23 August 2022
The Sceilg Mhichíl Works Report 2021 aims to outline the repair works completed on the UNESCO World Heritage Property of Sceilg Mhichíl in the season of 2021.
-
Download the Sceilg Mhichíl Works Report 2021
-
Download Appendix A - NIS Repair of Sea-wall along Old Lighthouse Road – Phase 4
-
Download Appendix B - NIS Construction of Public Toilets and Repair to Helicopter Pad, Repair to Pier Wall at Landing Pier and Repair of Gate Piers at Upper Lighthouse
-
Download Appendix C - OPW COVID 19 Health and Safety Management Plan
-
Download Appendix D - NIS Construction of 3 No. Permanent Crash Decks on Lighthouse Road
-
Download Appendix E - Glenwood Specialist Report on Condition of Remaining Timbers of Lower Lighthouse
-
Download Appendix F - Glenwood Timber Report Photos
-
Download Appendix G - UCC Atlantic Puffin Tagging Report
-
Download Appendix H - Archaeological Excavation of the Upper Lighthouse Station
-
Download Appendix I - Discovery Programme Monitoring Survey Report
-
Download Appendix J - Preliminary Visual Assessment of Building Stone at the Upper and Lower Lighthouses Skellig Michael

Sceilg Mhichíl World Heritage Property Management Plan, 2020–30
Posted on 17 December 2021
The Sceilg Mhichíl Management Plan 2020–2030 has been prepared by DHLGH in conjunction with the OPW. DHLGH is the state body responsible for heritage-policy matters in Ireland under the World Heritage Convention.
The aim of this plan is to protect and preserve the WHP of Sceilg Mhichíl, also known as Great Skellig.
The accompanying suite of documents relate to the AA and SEA processes associated with the development of the Management Plan.
-
Download the Sceilg Mhichíl Management Plan, 2020–2030
-
Download the Sceilg Mhichíl Draft Natura Impact Statement
-
Download the Sceilg Michíl Final Natura Impact Statement
-
Download the Sceilg Mhichíl Post Consultation Report
-
Download the Sceilg Mhichíl Strategic Environmental Assessment
-
Download the Sceilg Mhichíl Appropriate Assessment Conclusion Statement
-
Download the Sceilg Mhichíl Strategic Environmental Assessment Post Adoption Statement

Sceilg Mhichíl Works Report 2020
Posted on 22 February 2021
The Sceilg Mhichíl Works Report 2020 outlines the repair works completed on the UNESCO World Heritage Property of Sceilg Mhichíl in the 2020 season.
-
Download the Sceilg Mhichíl Works Report 2020
-
Download Appendix A - Archaeological Monitoring Upper Lighthouse Road
-
Download Appendix B - Discovery Programme Monitoring Skellig Michael Survey Report 2020
-
Download Appendix C - Scheme Report for Energy and Water Strategy, Upper and Lower Lighthouse
-
Download Appendix D - Fabric Retrofit Strategy for Improved Energy Efficiency at Lower Lighthouse
-
Download Appendix E - Lab Report on Geological Analysis at Lower Lighthouse
-
Download Appendix F - Atlantic Puffin Tagging Report 2020
-
Download Appendix G - Skellig Michael Storm Petrel Monitoring July 2020

Brú na Bóinne Education Packs
Posted on 24 August 2020
The Brú na Bóinne Education Packs follow the school curricula and are an aid for teachers and students studying Brú na Bóinne. They also offer activities to be completed on the Visitor Centre and in the class room.

Brú na Bóinne Management Plan, 2017
Posted on 1 June 2017
This document sets out the key objectives and vision for the management of the Brú na Bóinne World Heritage Property. The Management Plan has a term of ten years and provides a framework for the proactive and collaborative management of the site, helping to ensure that its Outstanding Universal Value is sustained and preserved for future generations.